The Parker Pointe project showcased Unbridled Contractors’ ability to tackle challenging land development conditions through innovative design and precise execution. This large-scale infrastructure build required navigating difficult soil profiles, persistent groundwater, and restricted work environments—all while maintaining schedule integrity.

The scope included a critical sanitary main bore beneath a CDOT-controlled roadway, requiring precise coordination to avoid existing military fiber infrastructure and tunnel safely beneath the Magellan petroleum delivery line. Our team also installed extensive deep reinforced concrete pipe (RCP) storm systems and hand-poured all manhole bases under difficult, high-groundwater conditions.

HIGHLIGHTS

Sanitary main bore beneath CDOT roadway avoiding military fiber and petroleum lines

Deep RCP storm system installations with hand-poured manhole bases

Full-scale dewatering and groundwater management system

Regrading and pond structure construction under adverse conditions

Lane widening in high-traffic corridor completed via night operations

All work delivered on schedule despite challenging site conditions

Engineering Solutions for Complex Ground Conditions

The Parker Pointe project showcased Unbridled Contractors’ ability to tackle challenging land development conditions through innovative design and precise execution. This large-scale infrastructure build required navigating difficult soil profiles, persistent groundwater, and restricted work environments—all while maintaining schedule integrity.

The scope included a critical sanitary main bore beneath a CDOT-controlled roadway, requiring precise coordination to avoid existing military fiber infrastructure and tunnel safely beneath the Magellan petroleum delivery line. Our team also installed extensive deep reinforced concrete pipe (RCP) storm systems and hand-poured all manhole bases under difficult, high-groundwater conditions.

HIGHLIGHTS

Sanitary main bore beneath CDOT roadway avoiding military fiber and petroleum lines

Deep RCP storm system installations with hand-poured manhole bases

Full-scale dewatering and groundwater management system

Regrading and pond structure construction under adverse conditions

Lane widening in high-traffic corridor completed via night operations

All work delivered on schedule despite challenging site conditions

UNBRIDLED SERVICES PROVIDED

  • Land Development & Infrastructure
  • Heavy Civil Construction
  • Utility Installation & Coordination
  • Dewatering & Groundwater Management
  • Traffic Control & Night Operations

UNBRIDLED SERVICES PROVIDED

  • Land Development & Infrastructure
  • Heavy Civil Construction
  • Utility Installation & Coordination
  • Dewatering & Groundwater Management
  • Traffic Control & Night Operations

Managing Groundwater and Soil Challenges

Persistent groundwater intrusion demanded comprehensive dewatering systems. We implemented strategically placed wellpoints at critical locations and maintained continuous pumping operations to lower the water table. This approach enabled successful installation of the pond outfall structure, flatwork, and detention pond grading.

Repeated weather setbacks required multiple regrading efforts, demanding constant adaptation to align proposed grades with existing site conditions—ultimately delivering a seamless, natural final appearance.

Managing Groundwater and Soil Challenges

Persistent groundwater intrusion demanded comprehensive dewatering systems. We implemented strategically placed wellpoints at critical locations and maintained continuous pumping operations to lower the water table. This approach enabled successful installation of the pond outfall structure, flatwork, and detention pond grading.

Repeated weather setbacks required multiple regrading efforts, demanding constant adaptation to align proposed grades with existing site conditions—ultimately delivering a seamless, natural final appearance.

Maintaining Momentum in a High-Traffic Corridor

The project’s most significant logistical challenge involved lane widening along Parker Road—a heavily trafficked corridor with very limited daytime work windows. To minimize public impact and keep progress on track, our crews transitioned to night operations in coordination with CDOT.

Through careful planning and coordination, we completed weeks of roadway excavation, utility installation, and preparation in just three nights—often through adverse weather—while maintaining traffic flow and public safety in an active right-of-way environment.

Maintaining Momentum in a High-Traffic Corridor

The project’s most significant logistical challenge involved lane widening along Parker Road—a heavily trafficked corridor with very limited daytime work windows. To minimize public impact and keep progress on track, our crews transitioned to night operations in coordination with CDOT.

Through careful planning and coordination, we completed weeks of roadway excavation, utility installation, and preparation in just three nights—often through adverse weather—while maintaining traffic flow and public safety in an active right-of-way environment.

Results That Define Adaptability

Despite unfavorable soils, persistent groundwater, and restrictive work windows, Unbridled Contractors delivered all infrastructure components on time and to spec. The Parker Pointe project highlights our ability to adapt construction methods, manage complex technical demands, and collaborate effectively with local agencies to meet both performance goals and community needs.

Results That Define Adaptability

Despite unfavorable soils, persistent groundwater, and restrictive work windows, Unbridled Contractors delivered all infrastructure components on time and to spec. The Parker Pointe project highlights our ability to adapt construction methods, manage complex technical demands, and collaborate effectively with local agencies to meet both performance goals and community needs.

Start Your Next Project With Confidence

Contact Us to discuss your infrastructure or site-development needs.

Flexential Data Center Form

Start Your Next Project With Confidence

Contact Us to discuss your infrastructure or site-development needs.

Flexential Data Center Form

1-303-996-6158

   
   
   

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.